norventusForgeToolkits for your Work
PremiumConstruction · Earthworks

Gravel and aggregate tonnage

Compacted volume, tons and truck loads of stone, gravel, base or sand for an area.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the foreman and site lead plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full aggregate order you can print or save to My work
  • 4 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Foreman and site leadTruck driverEstimator

Example result · fictional numbers

What you get: aggregate order

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

148.2 tons of dense-graded base (abc) in 7 loads, $5,025.22 delivered: $33.90 a ton, $9.42 a sq yd

Compacted volume
88.9 CY
Tons to order
148.2 tons
Truck loads
7

Order

Material
Dense-graded base (ABC), about 1.45 tons per loose CY (ask the quarry for its unit weight)
Tons to order
148.2 tons for 88.9 CY compacted plus 15% allowance
Loads
7 at 22.0 tons, last load 16.2 tons
Area to cover
4,800 sq ft = 533.3 sq yd (net, before fabric overlaps)

Also on the sheet

  • Truck weight check · 2 lines, starting with “Legal payload”
  • Cost sheet · 6 lines, starting with “Material”
  • Placing and compacting · 4 lines, starting with “Lifts”

The plain-words read of this example

Covering 533.3 sq yd at 6.0 in takes 148.2 tons of dense-graded base (abc) in 7 loads. Legal: a 22.0 tons payload grosses 74,000 lb, 6,000 lb under 80,000 lb. Delivered, it costs about $5,025.22: $33.90 a ton or $9.42 a sq yd. Place it in 1 lift and test each for density. Confirm the material's unit weight with the quarry before you order.

4 cited sources

  • 23 CFR 658.17, Weight (eCFR (Federal Highway Administration rules))
  • ASTM C29/C29M, Bulk Density (Unit Weight) and Voids in Aggregate (ASTM International)
  • ASTM D2940/D2940M, Graded Aggregate Material for Bases or Subbases (ASTM International)
  • ASTM D6938, In-Place Density and Water Content by Nuclear Methods (ASTM International)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here