norventusForgeToolkits for your Work
PremiumExpert check pendingConstruction · Electrical

Box fill check

Volume a box needs for its conductors, devices, clamps and grounds under NEC 314.16, against the box you plan to set.

Expert check pending. This tool shows its formula, cited sources and assumptions with every result, and it's included in its role plan. A qualified expert in this trade hasn't signed the method off yet, so check the result against your own code, engineer or supplier before you rely on it.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the electrician plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full box sheet you can print or save to My work
  • 3 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Electrician

Example result · fictional numbers

What you get: box sheet

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

18.00 cu in needed in 18.0 cu in: 100% full, 0.00 cu in spare

Box volume
18.0 cu in (Table 314.16(A))
Conductors
9.00 cu in (4 insulated conductors)
Clamps, fittings, devices and grounds (at 12 AWG, 2.25 cu in each)
9.00 cu in
Volume required
18.00 cu in
Box fill
100% of the box (OK)
Spare volume
0.00 cu in

Volume count, line by line (NEC 314.16(B))

14 AWG conductors
None (0 cu in at 14 AWG)
12 AWG conductors
4 × 2.25 = 9.00 cu in
10 AWG conductors
None (0 cu in at 10 AWG)
Unbroken loops counted twice
None
Internal cable clamps
1 at 12 AWG, 2.25 cu in
Fixture studs and hickeys
None

and 4 more lines

Also on the sheet

  • The box, the ring and the order · 7 lines, starting with “Box”

The plain-words read of this example

This box needs 18.00 cu in for its conductors, 1 device, clamps and grounds under NEC 314.16. The 18.0 cu in available is 100% used, so it passes with 0.00 cu in to spare. The allowances use the largest conductor in the box, 12 AWG, which errs on the safe side. For 12 boxes like this, the order is about $42.00.

3 cited sources

  • NFPA 70, National Electrical Code (NEC) (National Fire Protection Association)
  • NEC free access (read-only, free account) (National Fire Protection Association)
  • OSHA 29 CFR 1910.305, Wiring methods, components and equipment for general use (U.S. Occupational Safety and Health Administration)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here