Concrete slab, footing and pier volume
Cubic yards of concrete and the number of 60 or 80 lb bags for slabs, footings or round piers.
Free for the mason and concrete finisher role. No account needed.
How it works
Result
References
Check the work against these
The ready-mix order, the cost of ready-mix against bags and crew time, the base, vapor retarder and forms, and the checks before the pour, with sources. Numbers in the result and in the plain-words read point here.
- 1Quikrete Concrete Mix (No. 1101) data sheetDataQuikreteThe bag yields this sheet uses: an 80 lb bag makes about 0.60 cu ft, plus the mixing water and curing directions printed on the bag.
- 2IRC 2021, Chapter 5 Floors (R506 concrete floors on the ground)CodeInternational Code CouncilR506.1: a slab-on-ground floor at least 3-1/2 in thick; R506.2.2: a 4 in base of clean sand or gravel where needed; R506.2.3: the vapor retarder under the slab (6 mil in the 2018 IRC, 10 mil ASTM E1745 Class A in 2021). Check your adopted edition.
- 3ASTM C94/C94M, Standard Specification for Ready-Mixed ConcreteCodeASTM InternationalWhat the delivery ticket must show and the 1-1/2 hour limit from batching to discharge, unless the purchaser waives it.
- 4Concrete in Practice (CIP) sheetsHandoutNational Ready Mixed Concrete AssociationOne-page field sheets for ordering and placing: CIP 6 joints in slabs, CIP 11 curing, CIP 14 finishing flatwork, CIP 27 cold weather.
- 5ACI CODE-318-19(22), Building Code Requirements for Structural ConcreteCodeAmerican Concrete InstituteStrength-test frequency for structural concrete (26.12): at least once a day per mix and once per 150 cu yd. Applies when the drawings call for tested concrete.
Your history with this tool
Nothing yet
Every result you calculate is kept here, so you can open yesterday's numbers on the next job. It stays on this device; use Save to My work to keep a result in your account.
Want it on every device? Make a free account and save runs to My work.
Go deeper