EMT conduit fill check

Percent fill of an EMT conduit for a number of THHN conductors against the NEC 40% rule.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the foreman and site lead plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full run sheet you can print or save to My work
  • 3 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

ElectricianForeman and site leadElectrical engineer

Example result · fictional numbers

What you get: run sheet

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

9 × 12 AWG in 3/4 in EMT: 22.5% fill (OK), 20.0 A each after derating, no pull point to add for 270° of bends

Conductor area
0.1197 sq in
Conduit fill
22.5% of 40% allowed (OK)
Max 12 AWG in this conduit
16
Smallest EMT that works
1/2 in

Fill and conductor rating

Fill
22.5% of the 40% allowed in 3/4 in EMT: OK
Most 12 AWG in 3/4 in
16 conductors; check against Annex C
Current-carrying conductors
6: adjustment 80%
Ambient
Up to 86 °F (30 °C): correction 100%
Each conductor can carry
24.0 A from the 90 °C column (30 A × 0.80 × 1.00), no more than 25 A at 75 °C terminals and a 20 A breaker (240.4(D)): 20.0 A

Also on the sheet

  • Pulling and support · 3 lines, starting with “Bends”
  • Material list · 4 lines, starting with “EMT”

The plain-words read of this example

9 × 12 AWG THHN fill 3/4 in EMT to 22.5% against the 40% limit, so it fits. With 6 current-carrying conductors and air up to 86 °F (30 °C), each conductor is good for 20.0 A. The 270° of bends fit in one pull, and the 120 ft run needs 13 straps. Order 12 sticks of EMT and 1,153 ft of wire, about $309.54 before fittings.

3 cited sources

  • NFPA 70, National Electrical Code (NEC) (National Fire Protection Association)
  • NEC Chapter 9 (Tables 1, 4 and 5) and Informative Annex C (NFPA free access (read-only, free account))
  • Stumped by the Code? NEC Requirements for Using and Installing EMT (EC&M)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here