norventusForgeToolkits for your Work
PremiumConstruction · Drywall

Drywall sheets, screws, mud and tape

Sheets, screws, joint compound and tape for a room or floor from wall and ceiling areas.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the painter and drywaller plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full drywall bid you can print or save to My work
  • 3 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Painter and drywallerForeman and site leadEstimator

Example result · fictional numbers

What you get: drywall bid

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

42 sheets hung and finished to Level 4 in about 5 working days for $2,357.92 ($1.34 a sq ft)

Board area
1,760 sq ft
Sheets (4x12)
42
Screws
2,016 (about 6.7 lb of 1-1/4 in coarse)
Joint compound
17.6 gal → 4 boxes of 4.5 gal
Paper tape
651 ft → 2 rolls of 500 ft

Finish to Level 4

What it takes
Tape plus two more coats on flat joints, one on angles; fasteners three times
Passes over the joints
3
Joint compound
17.6 gal, 4 boxes of 4.5 gal (the tool's 3-coat figure is 17.6 gal)
Suits
Flat paint, light texture and most houses
Paper tape and screws
2 rolls of 500 ft; 2,016 screws

Also on the sheet

  • Crew and schedule · 4 lines, starting with “Hanging”
  • Bid · 5 lines, starting with “Board (42 at $18.00)”

The plain-words read of this example

1,760 sq ft of board takes 42 sheets; finished to Level 4 that is 3 passes over the joints and about 17.6 gal of compound. With 3 people it is about 40 person-hours and 5 working days including drying and sanding. Board, compound and labor come to $2,357.92, $1.34 a square foot before tape, screws and markup. If the paint is glossy or the walls take strong side light, GA-214 calls for Level 5.

3 cited sources

  • GA-214-2022, Recommended Levels of Finish for Gypsum Panel Products (quick reference guide) (Gypsum Association (hosted by CISCA))
  • GA-216, Application and Finishing of Gypsum Panel Products (Gypsum Association)
  • IRC 2021, Chapter 7 Wall Covering (R702.3 gypsum board) (International Code Council)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here