norventusForgeToolkits for your Work
PremiumConstruction · Earthworks

Soil swell and shrink converter

Convert bank, loose and compacted yards for a soil type, plus truck loads.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the foreman and site lead plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full haul ticket you can print or save to My work
  • 4 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Equipment operatorForeman and site leadTruck driverCivil engineerEstimator

Example result · fictional numbers

What you get: haul ticket

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

5,000 CY bank of common earth / loam = 6,250 CY loose in 391 legal loads, about 8.1 days with 4 trucks, $37,145.00 to haul

Bank (in place)
5,000 CY
Loose (hauled)
6,250 CY
Compacted (placed)
4,500 CY
Truck loads
391

Truck weight check

Weight per loose CY
2,400 lb (3,000 lb a bank CY over 25% swell)
Heaped 16 CY load
38,400 lb (19.2 tons)
Legal payload
50,000 lb (80,000 lb limit less 30,000 lb empty)
Gross weight loaded
68,400 lb
Yards per load to stay legal
16.0 CY
Verdict
The box fills before the weight limit: a heaped 16 CY load grosses 68,400 lb, 11,600 lb under 80,000 lb

Also on the sheet

  • Load ticket (one legal load) · 4 lines, starting with “Loose in the truck”
  • Hauling plan and cost · 5 lines, starting with “Total weight to move”
  • Same 5,000 CY bank in other soils (by volume) · 6 lines, starting with “Sand”

The plain-words read of this example

5,000 CY bank of common earth / loam becomes 6,250 CY loose and 4,500 CY compacted. At 3,000 lb a bank CY a heaped 16 CY load weighs 38,400 lb, against a legal payload of 50,000 lb. The box fills before the weight limit: a heaped 16 CY load grosses 68,400 lb, 11,600 lb under 80,000 lb. Hauling takes about 8.1 days with 4 trucks and costs $37,145.00. Check the weight per yard against scale tickets on day one.

4 cited sources

  • 23 CFR 658.17, Weight (eCFR (Federal Highway Administration rules))
  • Caterpillar Performance Handbook (edition 49) (Caterpillar, via MacAllister Machinery (Cat dealer))
  • ASTM D698, Laboratory Compaction Characteristics of Soil Using Standard Effort (ASTM International)
  • 29 CFR 1926.602, Material handling equipment (earthmoving equipment) (OSHA)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here