Project manager
Float, change orders, pay apps, permits and closeout. 16 tools: 2 are free, the rest are premium.
Free for project manager
Change order pricing (OH&P)
Price a change order from direct costs with overhead, profit, sub markup, tax and bond. No account needed.
Also free
Free picks from other roles that are useful for the project manager role too.
Premium tools
All of them come with the project manager plan.
Cut and fill volume (average end area)
Cut, fill and net earthwork between cross-sections using the average end area method.
Construction · EarthworksRent vs own equipment decision
Annual cost of owning a machine versus renting it by the day, week or 4-week month, and the break-even hours.
Construction · Equipment rentalLabor productivity and crew size
Labor hours, duration and crew size for a quantity of work from a unit productivity rate.
Construction · Project controlsSchedule float and critical path (simple)
For up to three parallel task chains to a milestone: which chain is critical, the float on the others and the slack to the deadline.
Construction · Project controlsPay application and retainage
Current payment due, retainage held and balance to finish, in the AIA G702 layout.
Construction · Project controlsOSHA incident rates (TRIR, DART)
Total recordable incident rate, DART rate and lost-time rate from cases and hours worked, against an industry benchmark.
Construction · SafetyConcrete pour planner
Truck loads, pour duration, truck spacing and trucks in rotation for a ready-mix pour.
Construction · ConcreteHouse cost per square foot estimate
Early budget for a home from heated area, garage and porch area, finish level, region and site costs.
Construction · ResidentialPunch-list and closeout readiness
Are you ready for the final walk, inspection and handover? Scores readiness and lists what is still open.
Construction · ResidentialGravity pipe flow capacity (Manning)
Full-pipe flow and velocity for a gravity storm or sewer pipe, and how full your design flow runs it.
Construction · UtilitiesAsphalt paving tonnage
Hot-mix tons, truck loads and tack coat for a paving area and thickness.
Construction · PavingWork zone taper length (MUTCD)
Taper length, channelizer count and spacing, and advance warning sign spacing for a lane closure.
Construction · Traffic controlSilt fence layout and quantity
Rows of silt fence needed on a slope, total length, stakes and rolls, and a drainage-area check.
Construction · Erosion controlPermit and mobilization readiness
Checks the permits, notices and agreements that most often hold up mobilization, with a score and the open items.
Construction · Project controlsThe project manager plan
All 16 project manager tools, one plan
$10.20 a month at the launch price (list $12). Save more paying by the quarter or year; add another role for less. One of them is still waiting on a trade expert's check; its card says so.