Permit and mobilization readiness

Checks the permits, notices and agreements that most often hold up mobilization, with a score and the open items.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the project manager plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full permit log you can print or save to My work
  • 4 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Foreman and site leadProject manager

Example result · fictional numbers

What you get: permit log

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

Mobilize for non-digging work only (83 / 100, 3 open, mobilization in 30 days)

Score
83 / 100
Verdict
Mobilize only on work not blocked by open items
Items complete
9 of 12
Confirm
Right-of-way / encroachment permit from the road owner
Confirm
Environmental clearances (wetlands 404, endangered species, historic)
Fix before work
Dewatering / discharge permit if pumping groundwater

Permit and notice log

Approved permit drawings on site (Building department)
In hand
Building or construction permit (Building department)
In hand
Right-of-way or encroachment permit (City, county or state DOT)
Confirm with the agency
SWPPP and NOI (EPA or the state stormwater program)
In hand
811 utility locates (State one-call center and each utility)
In hand
Traffic control plan (Road owner)
In hand

and 6 more lines

Also on the sheet

  • Dates to hit before mobilization · 5 lines, starting with “Stormwater permit”
  • What can start now · 3 lines, starting with “Office and paperwork”

The plain-words read of this example

Permit readiness is 83 / 100, with 3 of 12 items open: mobilize for non-digging work only. At 2.00 acres the project needs stormwater permit coverage. The NOI is filed. Building permit: Good for 150 days more; work starts in 30 days. Nobody digs until every utility has marked its lines.

4 cited sources

  • 29 CFR 1926.651, Specific excavation requirements (OSHA)
  • Stormwater discharges from construction activities (U.S. EPA (NPDES))
  • 2022 Construction General Permit webinar (U.S. EPA)
  • IRC R105.5 Expiration (2018), permit expiration notice (Skippack Township, Pennsylvania)

Plus 4 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here