norventusForgeToolkits for your Work
PremiumConstruction · Earthworks

Cut and fill volume (average end area)

Cut, fill and net earthwork between cross-sections using the average end area method.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the civil engineer plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full earthwork sheet you can print or save to My work
  • 4 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Foreman and site leadCivil engineerProject managerEstimator

Example result · fictional numbers

What you get: earthwork sheet

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

944 CY cut, 273 CY fill over 200 ft: 51 truckloads to export, about $8,901.71 in place

Stations / length
5 / 200 ft
Cut (bank)
944 CY
Fill (compacted)
273 CY
Bank CY needed for fill
303 CY
Net export (waste)
641 bank CY

Volumes by segment

Sta 0+00 to 0+50
cut 111 CY, fill 106 CY; mass ordinate -7 bank CY
Sta 0+50 to 1+00
cut 306 CY, fill 28 CY; mass ordinate 267 bank CY
Sta 1+00 to 1+50
cut 343 CY, fill 19 CY; mass ordinate 590 bank CY
Sta 1+50 to 2+00
cut 185 CY, fill 120 CY; mass ordinate 641 bank CY

Also on the sheet

  • Mass balance · 6 lines, starting with “Cut (bank)”
  • Trucking (export) · 2 lines, starting with “Export volume”
  • Quantity and price sheet · 6 lines, starting with “Excavate and load cut”

The plain-words read of this example

Over 200 ft the job has 944 CY of cut and 273 CY of compacted fill, which needs 303 CY bank at 10% shrinkage. Cut-heavy: 641 CY bank of surplus to waste or stockpile, or 801 CY loose in 51 truckloads. The mass line peaks at 641 bank CY at Sta 2+00 and balances in 1 place. At your unit prices the earthwork comes to about $8,901.71. Take the shrinkage from the geotech report for your compaction spec, since it moves the fill quantity directly.

4 cited sources

  • Caterpillar Performance Handbook (edition 49) (Caterpillar, via MacAllister Machinery (Cat dealer))
  • ASTM D698, Laboratory Compaction Characteristics of Soil Using Standard Effort (ASTM International)
  • ASTM D1557, Laboratory Compaction Characteristics of Soil Using Modified Effort (ASTM International)
  • 2022 Construction General Permit (CGP) (US Environmental Protection Agency)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here