Silt fence layout and quantity

Rows of silt fence needed on a slope, total length, stakes and rolls, and a drainage-area check.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the foreman and site lead plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full silt fence sheet you can print or save to My work
  • 3 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Foreman and site leadLaborerProject manager

Example result · fictional numbers

What you get: silt fence sheet

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

3 rows, 1,350 ft of fence, 27 inspections over 6.0 months, $4,725.00 to install and remove

Maximum slope length per row
50 ft
Rows of fence
3
Total fence
1,350 ft → 14 rolls of 100 ft
Stakes
228
Drainage-area check
OK (≤ 1/4 acre per 100 ft of fence)

Layout on the slope

Row 1
at the toe, below the disturbed area: 450 ft along the contour
Row 2
40 ft up the slope from row 1, 450 ft long
Row 3
80 ft up the slope from row 1, 450 ft long
Row spacing
40 ft (no more than 50 ft of slope above any row at 6.0%)

Also on the sheet

  • Install sheet · 6 lines, starting with “Fabric”
  • Inspection and maintenance · 4 lines, starting with “Schedule”
  • Cost sheet · 3 lines, starting with “Install”

The plain-words read of this example

At 6.0% over 120 ft of slope you need 3 rows of 450 ft, 1,350 ft of fence in 14 rolls with 228 stakes. The 1.00 acres draining to it is within the 1/4 acre per 100 ft limit. Plan 27 inspections over 6.0 months and clean out sediment before it reaches 12 in, half the fence height. Install and removal come to about $4,725.00. Your approved SWPPP and state permit govern over this sheet.

3 cited sources

  • 2022 Construction General Permit (CGP) (US Environmental Protection Agency)
  • National Menu of Best Management Practices for Stormwater: Construction (silt fence) (US Environmental Protection Agency)
  • Stormwater discharges from construction activities (US Environmental Protection Agency)

Plus 5 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here