norventusForgeToolkits for your Work
FreeConstruction · Earthworks

Trench volume and protection check

Excavation volume for a shored or sloped trench and the OSHA protective-system triggers.

Free for the laborer role. No account needed.

Your numbers

For the trench sheet7 more, filled with typical values
Trench volume and protection checkForge by Norventus

How it works

Result

Ready when you are.Enter your numbers and press Calculate.

References

Check the work against these

Pipe-zone and backfill quantities, spoil and trench-box moves, a protection checklist with ladders and inspections, and the days to lay it, with the OSHA sources. Numbers in the result and in the plain-words read point here.

  1. 1
    29 CFR 1926.651, Specific excavation requirementsCode
    OSHA
    Locate utilities before digging; a ladder, stair or ramp in trenches 4 ft or deeper within 25 ft of lateral travel; air testing over 4 ft where a hazardous atmosphere could exist; spoil at least 2 ft back; daily inspection by a competent person.
  2. 2
    29 CFR 1926.652, Requirements for protective systemsCode
    OSHA
    Cave-in protection is required except in stable rock or under 5 ft with no sign of a cave-in; tabulated data for shoring and shields stays on site; designs beyond the appendices need a registered engineer.
  3. 3
    Appendix A to Subpart P of Part 1926, Soil classificationCode
    OSHA
    How the competent person classifies stable rock and Types A, B and C, the visual and manual tests, and why submerged soil or freely seeping soil is Type C.
  4. 4
    Appendix B to Subpart P of Part 1926, Sloping and benchingCode
    OSHA
    Table B-1 maximum allowable slopes for excavations under 20 ft (Type A 3/4:1, Type B 1:1, Type C 1-1/2:1), and flatter slopes where there are signs of distress or surcharge loads.
  5. 5
    Trenching and Excavation Safety fact sheetHandout
    OSHA
    A one-page crew briefing: protective systems from 5 ft, engineer design from 20 ft, access and egress, inspections and the main hazards.
  6. 6
    Call Before You Dig (811)Guide
    US DOT Pipeline and Hazardous Materials Safety Administration
    Call 811 before any digging so utilities are marked; state one-call laws set the notice period, often 48 to 72 hours.

Your history with this tool

Nothing yet

Every result you calculate is kept here, so you can open yesterday's numbers on the next job. It stays on this device; use Save to My work to keep a result in your account.

Want it on every device? Make a free account and save runs to My work.

Go deeper

When this answer isn't the whole job

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here