norventusForgeToolkits for your Work
PremiumSupply Chain · Trucking

Axle group weight and bridge formula

Maximum legal weight on a group of axles under the federal bridge formula, against the load you plan to carry.

Get this tool with its role plan

This is a premium tool. It comes with its role's plan: sign in, then add the role in Billing.

Comes with the truck driver plan: every tool for the role, from $10.20 a month at the launch price.

  • Your own numbers, worked out as often as you like
  • The full load plan you can print or save to My work
  • 6 cited sources, linked, with the checks to make
  • Every other tool for the same role, in the same plan
  • A plain-words read of your result (a fuller AI read with the Bifrost AI add-on)

Included in these role plans

Truck driverLogistics and dispatchFleet and rental managerSafety and compliance lead

Example result · fictional numbers

What you get: load plan

Worked out by this tool from its default inputs. Its role plan lets you run your own numbers, print the sheet and save it.

79,000 lb on 5 axles, every group legal, 7 tie-downs

Bridge formula result
80,000 lb
Allowed on this group
80,000 lb (80,000 lb gross cap)
Planned vs allowed
1,000 lb under
Single axle limit
20,000 lb
Tandem axle limit
34,000 lb

Axle weights

Gross vehicle weight
79,000 lb of 80,000 lb on the Interstate
Outer bridge (axles 1–5, 51 ft)
79,000 lb of 80,000 lb: 1,000 lb under
Axle 1 (single)
12,000 lb of 20,000 lb; a steer axle is often limited lower by its tires
Axles 2–3 (tandem)
34,000 lb of 34,000 lb: at the limit
Axles 4–5 (tandem)
33,000 lb of 34,000 lb: 1,000 lb under
Tightest group
Axles 2–3: at the limit

Also on the sheet

  • Every axle group (bridge formula) · 10 lines, starting with “Axles 2–3”
  • Size and permits · 3 lines, starting with “Width”
  • Tie-downs · 5 lines, starting with “Tie-downs needed”

The plain-words read of this example

At 79,000 lb on 5 axles, every axle and axle group is within the federal bridge formula. The tightest is axles 2–3, right at its limit, so a heavier load there needs weight moved. For the 42,000 lb cargo you need 7 tie-downs of this rating: chained direct, each counts at half its WLL, which is the step people miss, and a machine needs at least 4 anyway. The scale ticket and the state's own limits have the final say.

6 cited sources

  • Federal Bridge Formula Weights (FHWA-HOP-19-028) (Federal Highway Administration, Office of Operations)
  • 23 CFR 658.17, Weight (Electronic Code of Federal Regulations)
  • 49 CFR 393.106, Aggregate working load limit (Electronic Code of Federal Regulations)
  • 49 CFR 393.110, Minimum number of tiedowns (Electronic Code of Federal Regulations)
  • 49 CFR 393.130, Heavy vehicles, equipment and machinery (Electronic Code of Federal Regulations)
  • Cargo securement rules (Federal Motor Carrier Safety Administration)

Plus 6 step-by-step checks, a print layout and a link that reopens it with your numbers.

Sign in to pin this tool to My work.

Norventus

Applied Intelligence, three ways.

One way of thinking, built for three different jobs. Here is how they compare.

  • Applied Intelligence

    Watch TowerFor Business

    Who it is for
    Leaders and operators of an organization.
    What you get
    Your team, goals and KPIs, assets on one map and a work tracker, set up with you in the Watch Tower Console in four weeks, then reviewed with you every week.
    How to start
    Start from your goal. The demo is free.
    Visit Watch Tower
  • Applied Intelligence

    BeaconFor Professionals

    Who it is for
    One professional and where their career goes next.
    What you get
    A personal career console: news for your role, certifications, a pay-target planner, lessons and projects.
    How to start
    3 days free. No card needed to start.
    Visit Beacon
  • Applied Intelligence

    ForgeFor your Work

    Who it is for
    The people who do the work, on site (Crew) or at a desk (Labs).
    What you get
    Small, clear tools for everyday jobs: calculators, quick references and checklists.
    How to start
    Many tools are free. No account needed.
    You are here