Paint quantity estimator
Gallons and 5-gallon pails of paint and primer for walls and ceilings.
Free for the painter and drywaller role. No account needed.
How it works
Result
References
Check the work against these
The painting bid: material order with loss, crew hours and days with recoat waits, labor, overhead and profit, price per square foot, and the pre-1978 lead check. Numbers in the result and in the plain-words read point here.
- 1Lead Renovation, Repair and Painting Program (RRP)CodeUS Environmental Protection AgencyFirms paid to disturb paint in homes, child care facilities and preschools built before 1978 must be EPA-certified and use lead-safe work practices.
- 229 CFR 1926.62, Lead (construction)CodeOSHAThe worker-protection rule for lead in construction, including renovation: an action level of 30 micrograms per cubic meter and a limit of 50, averaged over 8 hours.
- 3Occupational Outlook Handbook: Painters, Construction and MaintenanceDataUS Bureau of Labor StatisticsNational pay for painters: a median of $23.75 an hour in May 2025, before taxes, insurance and benefits. Use it to sanity-check your loaded labor rate.
Your history with this tool
Nothing yet
Every result you calculate is kept here, so you can open yesterday's numbers on the next job. It stays on this device; use Save to My work to keep a result in your account.
Want it on every device? Make a free account and save runs to My work.
Go deeper